Orbit Bloom Fuel Cell
Type
Entity Briefing
Entity
Coleto Creek - Fuel Change Only
Technology
fuel cell
Generated
2026-10-17T21:08:15.737Z

Briefing on Coleto Creek - Fuel Change Only

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
655 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2026-12-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Coleto Creek - Fuel Change Only is a 655 MW Gas project in Texas, currently active.

COLETO CREEK POWER LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-15.

Queue ID
ERCOT-26INR0664
Location
Goliad, Texas
Technology
Gas
Developer
COLETO CREEK POWER LLC
Market / region
ERCOT
Point of interconnection
8162 Coleto Creek 138kV

What stands out

1

Coleto Creek - Fuel Change Only is a 655 MW Gas project in Texas with status active.

2

COLETO CREEK POWER LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-12-15.

Market and operating context

Queue date
2025-04-21
Proposed COD
2026-12-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Coleto Creek - Fuel Change Only — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0664
LocationGoliad, Texas
TechnologyGas
DeveloperCOLETO CREEK POWER LLC
Market / regionERCOT
Point of interconnection8162 Coleto Creek 138kV
Queue date2025-04-21
Proposed COD2026-12-15