Coleto Creek - Fuel Change Only (ERCOT-26INR0664) — Project Summary

Queue ID
ERCOT-26INR0664
Capacity
655 MW
Technology
Gas
Status
active
Location
Goliad, TX
Region
ERCOT
Developer
COLETO CREEK POWER LLC
IA Status
Facility Study

Coleto Creek - Fuel Change Only

ERCOT-26INR0664BetaActiveGasERCOTLBNL + Live

655 MW generation in Goliad, TX · In queue since April 2025 · Proposed COD December 2026

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

655 MW

Capacity

1

Components

Gas

1y 7m

In Queue

Facility Study

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 8m

Facilities Study50%
Queue EntryApr 21, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-15

Queue history
26INR0664 · 17 monthly ERCOT reports, May 2025 – Sep 2026

Projected COD moved

0 times

Dec 2026 → Dec 2026

Net change

0 months

first report to latest

Capacity

655 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 21, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 15, 2026
From queue filing
Developer in saved assessment
Vistra Corp.
Filed as COLETO CREEK POWER LLC
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no IA executed. Vistra has announced plans to convert the coal plant to gas, and the coal unit is scheduled to retire in 2027. ercotqueue.com puts the build chance at 10%.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. victoriaedc.com/news-and-media/p/item/62329/vistra-announces-plans-to-repower-coleto-creek-power-plant-to-natural-gas
  2. interconnection.fyi/project/ercot-26inr0664
  3. ercotqueue.com/project/26INR0664

Commercial operation date: Only the LBNL/ERCOT proposed COD of 2026-12-15 exists; interconnection.fyi and Cleanview just repeat it. The Vistra repowering announcement gives no in-service date, only that the coal unit is scheduled to shut down in 2027. A December 2026 COD looks optimistic for a project still in Facility Study with no IA.

Developer: Vistra announced plans to repower its Coleto Creek Power Plant in Goliad County from coal to gas. That matches this fuel-change request, which was filed by the project LLC, Coleto Creek Power LLC. The project-to-Vistra link is inferred from the plant name and location, not stated in a document that cites the queue ID.

Status: LBNL and ERCOT trackers show the request as active with no IA. One aggregator (interxdata) labels it 'operational', which contradicts the queue data and the fact that the coal unit is still running, so I discounted it.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Coleto Creek - Fuel Change Only project is a proposed 655 MW gas-fired generation project located in Goliad County, Texas. The project, developed by Coleto Creek Power LLC, consists of steam turbine technology and is listed in the ERCOT interconnection queue as entry ERCOT-26INR0664, with a queue entry date of April 21, 2025. The proposed commercial operation date is December 15, 2026.

This project is currently listed as active in the ERCOT queue. It is linked to the existing Coleto Creek operating plant. The Coleto Creek - Fuel Change Only project has been the subject of recent news coverage, with eight articles appearing in industry and deals publications.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Goliad

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

COLETO CREEK POWER LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

8162 Coleto Creek 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
COL_COLETOG1
POI Substation
Coleto Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.