Briefing/projectactive
Ophelia Solar is a 111 MW Solar project in Texas, currently active.
Ophelia Solar is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-19.
- Queue ID
- ERCOT-23INR0471
- Location
- Ector, Texas
- Technology
- Solar
- Developer
- Ophelia Solar
- Market / region
- ERCOT
- Point of interconnection
- Tap 138 kV Raceway Switch #18663 - Shin Oak POD #11128
What stands out
1
Ophelia Solar is a 111 MW Solar project in Texas with status active.
2
Ophelia Solar is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-09-19.
Market and operating context
- Queue date
- 2022-09-02
- Proposed COD
- 2028-09-19
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.