Briefing on Old Aqueduct Batt

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
303 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-06-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Old Aqueduct Batt is a 303 MW Solar+Battery project in Texas, currently active.

Old Aqueduct LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-01.

Queue ID
ERCOT-22INR0330
Location
Hale, Texas
Technology
Solar+Battery
Developer
Old Aqueduct LLC
Market / region
ERCOT
Point of interconnection
23920 Blackwater 345kV

What stands out

1

Old Aqueduct Batt is a 303 MW Solar+Battery project in Texas with status active.

2

Old Aqueduct LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-06-01.

Market and operating context

Queue date
2020-05-01
Proposed COD
2028-06-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Old Aqueduct Batt — verified asset snapshot

FieldValue
Queue IDERCOT-22INR0330
LocationHale, Texas
TechnologySolar+Battery
DeveloperOld Aqueduct LLC
Market / regionERCOT
Point of interconnection23920 Blackwater 345kV
Queue date2020-05-01
Proposed COD2028-06-01