Briefing/projectactive
Ogalalla Storage is a 252 MW Battery project in Texas, currently active.
Hecate Energy Ogalalla Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-15.
- Queue ID
- ERCOT-27INR0143
- Location
- Castro, Texas
- Technology
- Battery
- Developer
- Hecate Energy Ogalalla Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- 23912 OGALLALA_5 345kV
What stands out
1
Ogalalla Storage is a 252 MW Battery project in Texas with status active.
2
Hecate Energy Ogalalla Solar LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-04-15.
Market and operating context
- Queue date
- 2024-01-03
- Proposed COD
- 2028-04-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.