Ogalalla Storage
251.6 MW storage in Castro, TX · In queue since January 2024 · Proposed COD April 2028
251.6 MW
Capacity
1
Components
Battery
2y 10m
In Queue
Facility Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-04-15
Projected COD moved
1 time
Mar 2027 → Apr 2028
Net change
+13 months
first report to latest
Capacity
251 → 252 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Entered ERCOT interconnection queue, Facility Study phase
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of April 2028. No independent news or press releases found to validate or contradict this target date.
Developer: LBNL filing uses project-specific LLC 'Hecate Energy Ogalalla Solar LLC' which is a standard shell entity structure. Parent operating company is Hecate Energy, a known utility-scale renewable developer.
Status: LBNL shows 'active' status with Facility Study phase. No public announcements found regarding project advancement, permitting, or construction milestones.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Ogalalla Storage project is a proposed 251.6 MW battery storage project located in Castro County, Texas. The project is being developed by Hecate Energy Ogalalla Solar LLC and is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0143, with a queue entry date of January 3, 2024.
The proposed commercial operation date for the Ogalalla Storage project is April 15, 2028. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the 23912 OGALLALA_5 345kV substation.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Castro
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Hecate Energy Ogalalla Solar LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
23912 OGALLALA_5 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Obtain a complete list of Hecate Energy's operating assets, including in-service dates, to accurately identify plants added since 2023.
Structured data lookup for Hecate Energy with rankings and aggregations.
Hecate Grid Gwent Storage 1
Data-driven briefing on Hecate Energy — fleet, generation, financial, and news signals.
Battery storage projects in ERCOT
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.