Briefing/projectactive
OBERON is a 1 GW Solar+Battery project in California, currently active.
The reported queue phase is C12. Proposed COD is 2026-04-15.
- Queue ID
- CAISO-1642
- Location
- Riverside, California
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Red Bluff Substation 500kV
What stands out
1
OBERON is a 1 GW Solar+Battery project in California with status active.
2
The reported queue phase is C12; proposed COD is 2026-04-15.
3
Latest linked story: “Oberon Solar and Storage Project, USA” (Power Technology, 2023-12-18).
Market and operating context
- Queue date
- 2019-04-15
- Proposed COD
- 2026-04-15
- IA status
- IA Executed
- Study phase
- C12
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.