Query
Oak Tree Energy Storage
Type
Entity Briefing
Entity
Oak Tree Energy Storage
Technology
battery
Generated
2026-10-19T04:48:23.126Z

Briefing on Oak Tree Energy Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
310 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2030-09-20
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Oak Tree Energy Storage is a 310 MW Battery project in Texas, currently active.

Live Oak Energy Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-09-20.

Queue ID
ERCOT-27INR0091
Location
Lavaca, Texas
Technology
Battery
Developer
Live Oak Energy Storage, LLC
Market / region
ERCOT
Point of interconnection
Tap Shaula (#5380) – South Texas (#5915)

What stands out

1

Oak Tree Energy Storage is a 310 MW Battery project in Texas with status active.

2

Live Oak Energy Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2030-09-20.

Market and operating context

Queue date
2023-12-04
Proposed COD
2030-09-20
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Oak Tree Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0091
LocationLavaca, Texas
TechnologyBattery
DeveloperLive Oak Energy Storage, LLC
Market / regionERCOT
Point of interconnectionTap Shaula (#5380) – South Texas (#5915)
Queue date2023-12-04
Proposed COD2030-09-20