Oak Tree Energy Storage (ERCOT-27INR0091) — Project Summary

Queue ID
ERCOT-27INR0091
Capacity
310.2 MW
Technology
Battery
Status
active
Location
Lavaca, TX
Region
ERCOT
Developer
Live Oak Energy Storage, LLC
IA Status
Facility Study

Oak Tree Energy Storage

ERCOT-27INR0091BetaActiveBatteryERCOTLBNL + Live

310.2 MW storage in Lavaca, TX · In queue since December 2023 · Proposed COD September 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

310.2 MW

Capacity

1

Components

Battery

2y 11m

In Queue

Facility Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 9m

Facilities Study50%
Queue EntryDec 4, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-09-20

Queue history
27INR0091 · 35 monthly ERCOT reports, Nov 2023 – Sep 2026

Projected COD moved

2 times

Nov 2027 → Sep 2030

Net change

+34 months

first report to latest

Capacity

310 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedDec 4, 2023
Interconnection agreement signedMay 26, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Sep 20, 2030
From queue filing
Developer in saved assessment
Live Oak Energy Storage, LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage. No public sign of construction, a permit, or an executed IA.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/battery-storage-projects/texas/27INR0091/oak-tree-energy-storage
  2. interconnection.fyi/project/ercot-27inr0091
  3. ercotqueue.com/whats-new
  4. groundtrace.io/developers/live-oak-energy-storage-llc-r33li45zhw5ic

Commercial operation date: Only the LBNL proposed COD (2030-09-20) is available. Cleanview's 'Expected online 2030' matches it but looks derived from the same queue data, so it is not an independent signal. No press release or developer announcement gives a different date.

Developer: Every source lists Live Oak Energy Storage, LLC, and the aggregators repeat the LBNL/ERCOT filing name. None identifies a parent or operating company behind this LLC, so it could be a shell, but that can't be confirmed.

Status: LBNL lists the project as active with a Facility Study IA status. The Sep 2026 ERCOT GIS report summary and interconnection.fyi still list it, and nothing indicates withdrawal or suspension.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Oak Tree Energy Storage is a proposed 310.2 MW battery storage project in Lavaca County, Texas. Developed by Live Oak Energy Storage, LLC, the project is currently active in the ERCOT interconnection queue as entry ERCOT-27INR0091, with a queue entry date of December 4, 2023. The proposed commercial operation date is August 1, 2029, and the project's interconnection agreement status is currently in the Facility Study phase.

The project consists entirely of battery storage with a total capacity of 310.2 MW. The point of interconnection is Tap Shaula (#5380) _x0013_ South Texas (#5915). The Oak Tree Energy Storage project has been the subject of recent news coverage, including reports on deals and industry developments.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Lavaca

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Live Oak Energy Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap Shaula (#5380) – South Texas (#5915)

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.