Query
O'Bannion Energy Storage
Type
Entity Briefing
Entity
O'Bannion Energy Storage
Technology
battery
Generated
2026-09-03T16:39:52.629Z

Briefing on O'Bannion Energy Storage

Entity Briefing
Generated Sep 3, 2026·Dataset freshness not reported
306 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-04-21
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

O'Bannion Energy Storage is a 306 MW Battery project in Texas, currently active.

O'Bannion Energy Storage, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-04-21.

Queue ID
ERCOT-25INR0657
Location
Jack, Texas
Technology
Battery
Developer
O'Bannion Energy Storage, LLC
Market / region
ERCOT
Point of interconnection
1506 Long Hollow Switch 345 kV

What stands out

1

O'Bannion Energy Storage is a 306 MW Battery project in Texas with status active.

2

O'Bannion Energy Storage, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-04-21.

Market and operating context

Queue date
2024-05-09
Proposed COD
2028-04-21
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

O'Bannion Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0657
LocationJack, Texas
TechnologyBattery
DeveloperO'Bannion Energy Storage, LLC
Market / regionERCOT
Point of interconnection1506 Long Hollow Switch 345 kV
Queue date2024-05-09
Proposed COD2028-04-21