O'Bannion Energy Storage (ERCOT-25INR0657) — Project Summary

Queue ID
ERCOT-25INR0657
Capacity
306.4 MW
Technology
Battery
Status
active
Location
Jack, TX
Region
ERCOT
Developer
O'Bannion Energy Storage, LLC
IA Status
IA Executed

O'Bannion Energy Storage

ERCOT-25INR0657BetaActiveBatteryERCOTLBNL + Live

306.4 MW storage in Jack, TX · In queue since May 2024 · Proposed COD April 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

306.4 MW

Capacity

1

Components

Battery

2y 6m

In Queue

IA Executed

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 7m

IA → COD

2y 4m

Total Duration

1y 7m

Construction75%
Queue EntryMay 9, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 5, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-04-21

Queue history
25INR0657 · 29 monthly ERCOT reports, May 2024 – Sep 2026

Projected COD moved

2 times

Dec 2025 → Apr 2028

Net change

+28 months

first report to latest

Capacity

306 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 9, 2024
Facilities study approvedMay 2, 2025
Interconnection agreement signedDec 5, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 21, 2028
From queue filing
Developer in saved assessment
O'Bannion Energy Storage
From queue filing
Status at research time
IA Executed
Active in ERCOT queue with IA executed 2025-12-05; still listed as 'Planned' in EIA-based trackers, with a Jack County tax abatement under consideration and no construction start reported.
Financing
Not recorded

Milestones in this assessment

IA executedDec 5, 2025Latest in this assessment

LBNL queue record shows interconnection agreement executed for ERCOT-25INR0657 (306.4 MW battery); the URL is a queue listing for the project, not a confirmation of the IA date.

interconnection.fyi
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. grahamleader.com/jacksboro-herald-gazette/article_cdbf079f-f0c7-451d-84de-7ae518e23301.html
  2. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  3. interconnection.fyi/projects/state/TX/jack-county
  4. energyincidentregister.com/facility/o-bannion-energy-storage-tx-us-70367-battery/

Commercial operation date: No post-LBNL source gives a COD or target date. The Jack County abatement article and the EIA trackers only show the project as planned, so the LBNL proposed COD of 2028-04-21 is the only date available.

Developer: Sources use only the project-named entity "O'Bannion Energy Storage, LLC" (the abatement article, PUC filings, and trackers). No parent or operating company is identified, so the LBNL name stands.

Status: LBNL shows IA Executed with an active queue status. Search results describe the project as planned and seeking a local property-tax abatement, with no evidence of construction, withdrawal, or cancellation.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

O'Bannion Energy Storage is a proposed 306.4 MW battery storage project located in Jack County, Texas. The project, developed by O'Bannion Energy Storage, LLC, is currently active in the ERCOT interconnection queue as entry ERCOT-25INR0657, with a queue entry date of May 9, 2024. The proposed commercial operation date is April 21, 2028, and the project's interconnection agreement status is currently in the Facility Study phase.

The proposed project consists of 306.4 MW of battery storage capacity. Recent news coverage indicates regulatory interest in the project.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Jack

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

O'Bannion Energy Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

1506 Long Hollow Switch 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.