Nockenut Springs Solar 2 is a 203 MW Solar project in Texas, currently active.
Pecan Springs Energy, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2029-06-05.
- Queue ID
- ERCOT-24INR0007
- Location
- Guadalupe, Texas
- Technology
- Solar
- Developer
- Pecan Springs Energy, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 5133 Elm Creek - 5915 STP ckt 1
What stands out
1
Nockenut Springs Solar 2 is a 203 MW Solar project in Texas with status active.
2
Pecan Springs Energy, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2029-06-05.
Market and operating context
- Queue date
- 2020-09-25
- Proposed COD
- 2029-06-05
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.