Nockenut Springs Solar 2
Type
Entity Briefing
Entity
Nockenut Springs Solar 2
Generated
2026-10-19T21:15:34.985Z

Briefing on Nockenut Springs Solar 2

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
203 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-06-05
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Nockenut Springs Solar 2 is a 203 MW Solar project in Texas, currently active.

Pecan Springs Energy, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2029-06-05.

Queue ID
ERCOT-24INR0007
Location
Guadalupe, Texas
Technology
Solar
Developer
Pecan Springs Energy, LLC
Market / region
ERCOT
Point of interconnection
tap 345kV 5133 Elm Creek - 5915 STP ckt 1

What stands out

1

Nockenut Springs Solar 2 is a 203 MW Solar project in Texas with status active.

2

Pecan Springs Energy, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2029-06-05.

Market and operating context

Queue date
2020-09-25
Proposed COD
2029-06-05
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Nockenut Springs Solar 2 — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0007
LocationGuadalupe, Texas
TechnologySolar
DeveloperPecan Springs Energy, LLC
Market / regionERCOT
Point of interconnectiontap 345kV 5133 Elm Creek - 5915 STP ckt 1
Queue date2020-09-25
Proposed COD2029-06-05