Briefing/projectactive
Nazareth Solar is a 203 MW Solar project in Texas, currently active.
TX Nazareth Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-08-31.
- Queue ID
- ERCOT-16INR0049
- Location
- Castro, Texas
- Technology
- Solar
- Developer
- TX Nazareth Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 23914 Tule Canyon - 23912 Ogallala C2
What stands out
1
Nazareth Solar is a 203 MW Solar project in Texas with status active.
2
TX Nazareth Solar, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-08-31.
4
Latest linked story: “Solar power project coming to Nazareth area around 2025” (KFDA | NewsChannel 10, 2023-07-05).
Market and operating context
- Queue date
- 2014-06-19
- Proposed COD
- 2027-08-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.