Briefing on MRG Goody Solar Project Hybrid

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
221 MW
Capacity
Under construction
Current status
2
Generators
Briefing/plantUnder construction

MRG Goody Solar Project Hybrid is a 221 MW Batteries asset in ERCOT (Texas), currently Under construction.

MRG Goody Solar Project Hybrid is reported in Texas under Nexus Renewable Power, LLC. Available operating and financial measures include $1361/kW reported CapEx.

Location
Lamar, Texas
Technology
Batteries, Solar Photovoltaic
Owner / parent
Nexus Renewable Power, LLC
Operator
Nexus Renewable Power, LLC
Grid
ERCOT (Texas)
Plant ID
66390

What stands out

1

MRG Goody Solar Project Hybrid is a 221 MW Batteries asset in Texas with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

Latest linked story: “Meta signs renewable supply agreement with Nexus in Lamar County, Texas” (Data Center Dynamics, 2025-09-24).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#129 of 378
National rank
#318 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

MRG Goody Solar Project Hybrid — verified asset snapshot

FieldValue
LocationLamar, Texas
TechnologyBatteries, Solar Photovoltaic
Owner / parentNexus Renewable Power, LLC
OperatorNexus Renewable Power, LLC
GridERCOT (Texas)
Plant ID66390
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.