MRG Goody Solar Project Hybrid is a 221 MW Batteries asset in ERCOT (Texas), currently Under construction.
MRG Goody Solar Project Hybrid is reported in Texas under Nexus Renewable Power, LLC. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Lamar, Texas
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- Nexus Renewable Power, LLC
- Operator
- Nexus Renewable Power, LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 66390
What stands out
MRG Goody Solar Project Hybrid is a 221 MW Batteries asset in Texas with status Under construction.
Available financial measures include $1361/kW CapEx.
Latest linked story: “Meta signs renewable supply agreement with Nexus in Lamar County, Texas” (Data Center Dynamics, 2025-09-24).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #129 of 378
- National rank
- #318 of 7,971
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.