Search plants, projects, owners, and states
221.2 MW Batteries (50 MW) + Solar Photovoltaic (171 MW) under construction in Lamar, TX
221.2 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
—
Operating Since
Coordinates
33.6392, -95.6291
County
Lamar, TX
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Nexus Renewable Power, LLC | — | — |
| Owner(s) | MRG Goody Solar Project, LLC | — | — |
| Status | Under construction | construction | — |
The MRG Goody Solar Project Hybrid is a 221.2 MW hybrid power plant located in Lamar County, Texas. The plant, identified by plant ID 66390, is owned and operated by MRG Goody Solar Project, LLC. It utilizes both solar photovoltaic technology and battery storage, and consists of two generators. The primary fuel type is listed as MWH, indicating the plant's reliance on electricity generation from renewable sources.
The facility operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and is situated in the TRE NERC region. As of the latest rankings, the MRG Goody Solar Project Hybrid is the 85th largest power plant in Texas out of 224, and ranks 243rd nationally out of 514. The solar component of the plant employs a fixed tilt tracking system. Recent news coverage includes 3 articles related to deals and 1 article related to the industry.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
—
Sector
IPP Non-CHP
No generation data available for this plant.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $301.1M
Market Position
ISO/RTO Market
ERCOT
LMP Node
TOCO_8
Pricing Hub
HB_NORTH
Node Source
EIA-860 direct report
Last updated 2026-03-26
View all articlesTop solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the InfraSure database.