Query
Moraine Sands Wind Power
Type
Entity Briefing
Entity
Vast Sands Power I (TEF -Due Diligence)
State
ME
Technology
wind
Generated
2026-10-08T18:56:08.358Z

Briefing on Vast Sands Power I (TEF -Due Diligence)

Entity Briefing
Generated Oct 8, 2026·Dataset freshness not reported
440 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2028-05-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Vast Sands Power I (TEF -Due Diligence) is a 440 MW Gas project in Texas, currently active.

Permian Power I LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-05-01.

Queue ID
ERCOT-28INR0105
Location
Ward, Texas
Technology
Gas
Developer
Permian Power I LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2

What stands out

1

Vast Sands Power I (TEF -Due Diligence) is a 440 MW Gas project in Texas with status active.

2

Permian Power I LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-05-01.

Market and operating context

Queue date
2024-07-22
Proposed COD
2028-05-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Vast Sands Power I (TEF -Due Diligence) — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0105
LocationWard, Texas
TechnologyGas
DeveloperPermian Power I LLC
Market / regionERCOT
Point of interconnectionTap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2
Queue date2024-07-22
Proposed COD2028-05-01