Vast Sands Power I (TEF -Due Diligence) (ERCOT-28INR0105) — Project Summary

Queue ID
ERCOT-28INR0105
Capacity
440 MW
Technology
Gas
Status
active
Location
Ward, TX
Region
ERCOT
Developer
Permian Power I LLC
IA Status
IA Executed

Vast Sands Power I (TEF -Due Diligence)

ERCOT-28INR0105BetaActiveGasERCOTLBNL + Live

440 MW generation in Ward, TX · In queue since July 2024 · Proposed COD May 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

440 MW

Capacity

1

Components

Gas

2y 4m

In Queue

IA Executed

IA Phase

Signed Oct 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 3m

IA → COD

2y 7m

Total Duration

1y 3m

Construction75%
Queue EntryJul 22, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementOct 31, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2028-05-01

Queue history
28INR0105 · 27 monthly ERCOT reports, Jul 2024 – Sep 2026

Projected COD moved

2 times

Jun 2028 → May 2028

Net change

-1 months

first report to latest

Capacity

440 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJul 22, 2024
Facilities study approvedSep 16, 2026
Interconnection agreement signedOct 31, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 1, 2028
From queue filing
Developer in saved assessment
Permian Power I LLC
From queue filing
Status at research time
IA Executed
Active in the ERCOT queue. IA executed 2025-10-31; trackers show the study phase as SS completed and FIS started or pending. No construction start found. The project name carries a 'TEF - Due Diligence' tag.
Financing
Not recorded

Milestones in this assessment

IA executedOct 31, 2025Latest in this assessment

Interconnection agreement date recorded in ERCOT's Generator Interconnection Status report.

app.nrgmap.com
Research sources and reasoning (7 recorded sources)

low confidence at research time

  1. app.nrgmap.com/queues/ercot-28inr0105
  2. ercotqueue.com/project/28INR0105
  3. interconnection.fyi/project/ercot-28inr0105
  4. interconnection.fyi/eia/plant/69689
  5. cleanview.co/power-projects/planned/natural-gas-power-plants/texas/28INR0105/vast-sands-power-i-tef--due-diligence
  6. cleanview.co/power-projects/planned/natural-gas-power-plants/texas/69689_CT11/vast-sands-power
  7. interxdata.com/projects/vast-sands-power-i-tef-due-diligence-ercot-gis-report-28inr0105/

Commercial operation date: The only COD in the ERCOT/LBNL data is 2028-05-01. The aggregators (nrgmap, interconnection.fyi, Cleanview's 2028 entry) repeat it, so they are not independent confirmation. A separate EIA-860 plant record (Vast Sands Power, CT11) shows 2027, but it is an unconfirmed related record and no developer or news source supports it.

Developer: Every source, including the EIA-860 plant record that lists Permian Power I LLC as operator, names Permian Power I LLC. No parent or operating company was found in the search results.

Status: LBNL and ERCOT-derived trackers (nrgmap, ercotqueue.com) show an active queue position with an IA dated 2025-10-31. One interXdata page lists 'operational', but that contradicts ERCOT's active status and the 2028 proposed COD, so I treated it as a normalization error.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Vast Sands Power I (TEF -Due Diligence) is a proposed 440 MW natural gas generation project located in Ward County, Texas. The developer is Permian Power I LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-28INR0105, with a queue entry date of July 22, 2024.

The proposed commercial operation date is May 1, 2028. The project's interconnection status is currently in the Facility Study phase.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Ward

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Permian Power I LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.