Briefing/projectactive
Moonstone Solar Project is a 146 MW Solar project in Texas, currently active.
Moon Stone Solar Farm, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2029-03-31.
- Queue ID
- ERCOT-24INR0156
- Location
- Wilson, Texas
- Technology
- Solar
- Developer
- Moon Stone Solar Farm, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV Eagle Creek (5132) to Floresville (5155)
What stands out
1
Moonstone Solar Project is a 146 MW Solar project in Texas with status active.
2
Moon Stone Solar Farm, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2029-03-31.
Market and operating context
- Queue date
- 2021-10-27
- Proposed COD
- 2029-03-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.