Briefing on Moonstone Solar Project

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
146 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-03-31
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Moonstone Solar Project is a 146 MW Solar project in Texas, currently active.

Moon Stone Solar Farm, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2029-03-31.

Queue ID
ERCOT-24INR0156
Location
Wilson, Texas
Technology
Solar
Developer
Moon Stone Solar Farm, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV Eagle Creek (5132) to Floresville (5155)

What stands out

1

Moonstone Solar Project is a 146 MW Solar project in Texas with status active.

2

Moon Stone Solar Farm, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2029-03-31.

Market and operating context

Queue date
2021-10-27
Proposed COD
2029-03-31
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Moonstone Solar Project — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0156
LocationWilson, Texas
TechnologySolar
DeveloperMoon Stone Solar Farm, LLC
Market / regionERCOT
Point of interconnectionTap 138kV Eagle Creek (5132) to Floresville (5155)
Queue date2021-10-27
Proposed COD2029-03-31