Briefing/projectactive
Monument Hill Solar is a 200 MW Solar project in Texas, currently active.
RWE Solar Development, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-06-30.
- Queue ID
- ERCOT-25INR0512
- Location
- Fayette, Texas
- Technology
- Solar
- Developer
- RWE Solar Development, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 7055 Fayette - 9074 Lytton Springs
What stands out
1
Monument Hill Solar is a 200 MW Solar project in Texas with status active.
2
RWE Solar Development, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-06-30.
Market and operating context
- Queue date
- 2023-10-13
- Proposed COD
- 2029-06-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.