Momentum Stout BESS
Type
Entity Briefing
Entity
Momentum Stout BESS
ISO/RTO
spp
Technology
battery
Generated
2026-10-19T11:50:29.775Z

Briefing on Momentum Stout BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
126 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-10-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Momentum Stout BESS is a 126 MW Battery project in Texas, currently active.

Momentum STOUT, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-10-01.

Queue ID
ERCOT-26INR0272
Location
Burnet, Texas
Technology
Battery
Developer
Momentum STOUT, LLC
Market / region
ERCOT
Point of interconnection
70111 Flat Rock 138kV

What stands out

1

Momentum Stout BESS is a 126 MW Battery project in Texas with status active.

2

Momentum STOUT, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-10-01.

Market and operating context

Queue date
2023-11-14
Proposed COD
2027-10-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Momentum Stout BESS — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0272
LocationBurnet, Texas
TechnologyBattery
DeveloperMomentum STOUT, LLC
Market / regionERCOT
Point of interconnection70111 Flat Rock 138kV
Queue date2023-11-14
Proposed COD2027-10-01