Briefing/projectactive
Mesteno Wind is a 202 MW Wind project in Texas, currently active.
Mesteno Windpower, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2025-06-30.
- Queue ID
- ERCOT-16INR0081
- Location
- Starr, Texas
- Technology
- Wind
- Developer
- Mesteno Windpower, LLC
- Market / region
- ERCOT
- Point of interconnection
- 80355 Del Sol 345kV
What stands out
1
Mesteno Wind is a 202 MW Wind project in Texas with status active.
2
Mesteno Windpower, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2025-06-30.
4
Latest linked story: “Duke Energy Renewables constructs 200-MW Mesteño Wind Project in Texas” (Duke Energy, 2019-04-11).
Market and operating context
- Queue date
- 2014-12-30
- Proposed COD
- 2025-06-30
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.