Briefing on Mesteno Wind

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
202 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2025-06-30
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Mesteno Wind is a 202 MW Wind project in Texas, currently active.

Mesteno Windpower, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2025-06-30.

Queue ID
ERCOT-16INR0081
Location
Starr, Texas
Technology
Wind
Developer
Mesteno Windpower, LLC
Market / region
ERCOT
Point of interconnection
80355 Del Sol 345kV

What stands out

1

Mesteno Wind is a 202 MW Wind project in Texas with status active.

2

Mesteno Windpower, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2025-06-30.

4

Latest linked story: “Duke Energy Renewables constructs 200-MW Mesteño Wind Project in Texas” (Duke Energy, 2019-04-11).

Market and operating context

Queue date
2014-12-30
Proposed COD
2025-06-30
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Mesteno Wind — verified asset snapshot

FieldValue
Queue IDERCOT-16INR0081
LocationStarr, Texas
TechnologyWind
DeveloperMesteno Windpower, LLC
Market / regionERCOT
Point of interconnection80355 Del Sol 345kV
Queue date2014-12-30
Proposed COD2025-06-30