Briefing/projectactive
Mesa View Storage is a 251 MW Battery project in Texas, currently active.
Mesa View Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-15.
- Queue ID
- ERCOT-25INR0417
- Location
- Upton, Texas
- Technology
- Battery
- Developer
- Mesa View Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV KINGMTSW (#842) to NORTMC (#76000)
What stands out
1
Mesa View Storage is a 251 MW Battery project in Texas with status active.
2
Mesa View Storage, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-06-15.
4
Latest linked story: “Best Energy/Industrial: Garnet Mesa Solar” (ENR, 2025-11-21).
Market and operating context
- Queue date
- 2023-04-19
- Proposed COD
- 2027-06-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.