Mesa View Storage (ERCOT-25INR0417) — Project Summary

Queue ID
ERCOT-25INR0417
Capacity
251.3 MW
Technology
Battery
Status
active
Location
Upton, TX
Region
ERCOT
Developer
Mesa View Storage, LLC
IA Status
Facility Study

Mesa View Storage

ERCOT-25INR0417BetaActiveBatteryERCOTLBNL + Live

251.3 MW storage in Upton, TX · In queue since April 2023 · Proposed COD July 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

251.3 MW

Capacity

1

Components

Battery

3y 7m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 3m

Facilities Study50%
Queue EntryApr 19, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-07-15

Queue history
25INR0417 · 42 monthly ERCOT reports, Apr 2023 – Sep 2026

Projected COD moved

5 times

May 2025 → Jul 2027

Net change

+26 months

first report to latest

Capacity

502 → 255 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 19, 2023
Facilities study approvedJun 11, 2026
Interconnection agreement signedSep 9, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneconstruction completionENR · 2025-11-21

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 2027
Differs from queue: Jul 15, 2027From queue filing
Developer in saved assessment
Mesa View Storage, LLC
From queue filing
Status at research time
Active
Active — in Facility Study phase, interconnection agreement amendment filed with Texas PUC in April 2026
Financing
Not recorded

Milestones in this assessment

IA executedApr 29, 2026Latest in this assessment

First Amendment to Standard Generation Interconnection Agreement filed with Texas PUC between City of Garland and Mesa View Storage, LLC

interchange.puc.texas.gov
Research sources and reasoning (4 recorded sources)

medium confidence at research time

  1. interchange.puc.texas.gov/Search/Filings?ControlNumber=35077&ItemMatch=0&SortBy=ItemNumber&SortOrder=Descending
  2. ercot.com/files/docs/2026/04/07/Capacity-Changes-by-Fuel-Type-Charts_March_2026_PlannedMonthly.xlsx
  3. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0417/mesa-view-storage
  4. interconnection.fyi/project/ercot-25inr0417

Commercial operation date: LBNL queue snapshot shows June 2027 COD. ERCOT planning document from April 2026 confirms 2027 target. No contradictory signals from news or developer announcements.

Developer: Only source is LBNL filing entity 'Mesa View Storage, LLC'. No press releases or news coverage identifying a parent operating company. Texas PUC filing (April 2026) confirms same entity name in interconnection agreement with City of Garland.

Status: LBNL shows 'active' status in Facility Study phase. Texas PUC Interchange shows First Amendment to Standard Generation Interconnection Agreement filed April 29, 2026, indicating active progression through interconnection process.

Project lifecycle
as of 2025-11-21
PhaseOnlineENR · 2025-11-21
OperationalYesENR · 2025-11-21
TechnologySolarENR · 2025-11-21
DeveloperAlluvial PowerENR · 2025-11-21
EPC contractorPrimoris Renewable EnergyENR · 2025-11-21

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Mesa View Storage is a proposed 251.3 MW battery storage project located in Upton County, Texas. The project, developed by Mesa View Storage, LLC, is currently in the ERCOT interconnection queue as entry ERCOT-25INR0417, with a queue entry date of April 19, 2023. The proposed commercial operation date is June 15, 2027, and the project's interconnection agreement status is currently in the Facility Study phase.

The Mesa View Storage project has been the subject of recent news coverage, with six articles related to the project appearing in the news. These articles cover topics such as deals, industry trends, and project development.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Upton

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Mesa View Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV KINGMTSW (#842) to NORTMC (#76000)

Data Source

LBNL + Live

DeveloperAlluvial PowerENR · 2025-11-21
EPC contractorPrimoris Renewable EnergyENR · 2025-11-21
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.