Briefing on Merom Station

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
530 MW
Proposed capacity
active
Current status
Battery
Technology
MISO
Market / region
2028-11-01
Proposed COD
In Progress (unknown study)
Queue phase
Briefing/projectactive

Merom Station is a 530 MW Battery project in Indiana, currently active.

Hallador Power is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2028-11-01.

Queue ID
MISO-E0054
Location
Sullivan, Indiana
Technology
Battery
Developer
Hallador Power
Market / region
MISO
Point of interconnection
Merom Substation

What stands out

1

Merom Station is a 530 MW Battery project in Indiana with status active.

2

Hallador Power is the reported developer.

3

The reported queue phase is In Progress (unknown study); proposed COD is 2028-11-01.

Market and operating context

Queue date
2025-11-04
Proposed COD
2028-11-01
IA status
In Progress (unknown study)
Study phase
In Progress (unknown study)
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Merom Station — verified asset snapshot

FieldValue
Queue IDMISO-E0054
LocationSullivan, Indiana
TechnologyBattery
DeveloperHallador Power
Market / regionMISO
Point of interconnectionMerom Substation
Queue date2025-11-04
Proposed COD2028-11-01