Merom Station (MISO-E0054) — Project Summary

Queue ID
MISO-E0054
Capacity
530 MW
Technology
Battery
Status
active
Location
Sullivan, IN
Region
MISO
Developer
Hallador Power
IA Status
In Progress (unknown study)

Merom Station

MISO-E0054BetaActiveGasBatteryMISOLBNL

530 MW hybrid in Sullivan, IN · In queue since November 2025 · Proposed COD November 2028

BA: MISOISO/RTO: MISONERC: RFCRC: MISO

530 MW

Capacity

1

Components

Gas

1 year

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3 years

In Study38%
Queue EntryNov 4, 2025

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-11-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Nov 1, 2028
From queue filing
Developer in saved assessment
Hallador Energy Company
Filed as Hallador Power
Status at research time
Active
Active in the MISO queue (E0054). Interconnection.fyi lists it as a Battery/Gas hybrid, and the sister filing Merom Storage (E0055) is withdrawn. No public construction or permitting milestones were found for the battery.
Financing
Not recorded

Milestones in this assessment

Ownership changeFeb 2022Latest in this assessment

Hallador Energy and Hoosier Energy announced a deal to transfer ownership of the coal-fired Merom Station to Hallador.

powermag.com
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/projects/state/IN/sullivan-county
  2. powermag.com/press-releases/hallador-energy-hoosier-energy-have-deal-to-transfer-ownership-of-coal-fired-merom-station/
  3. facebook.com/tribstar/posts/the-announcement-this-week-that-hallador-energy-through-a-new-subsidiary-hallado/10158873196253507/
  4. insideindianabusiness.com/articles/hallador-inks-700m-agreements-for-energy-generated-at-merom-station

Commercial operation date: Only the LBNL filing gives a COD (2028-11-01). The recent coverage found covers Duke Energy Indiana PPA and capacity deals for the existing coal-fired Merom plant, and none of it gives a date for the 530 MW battery project.

Developer: Hallador Power is the subsidiary Hallador Energy used to acquire Merom Station from Hoosier Energy in 2022, so Hallador Energy is the parent and operating company. The queue filing was made in 2025, after the acquisition, so there is no ownership change at the project level.

Status: LBNL shows Active and interconnection.fyi confirms it. Nothing found suggests withdrawal or construction.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Merom Station (queue ID MISO-E0054) is a proposed hybrid energy development project in Sullivan County, Indiana, developed by Hallador Power. The project is listed with a total capacity of 530 MW and combines natural gas and battery storage technologies. The component data specify 530 MW of gas-fired capacity, and the battery storage portion is not assigned a separate capacity figure. Hallador Power is also identified as the utility associated with the project.

The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO), which it entered on November 4, 2025. Its status is active. It proposes to connect to the grid at the Merom Substation and has requested Network Resource Interconnection Service (NRIS). The interconnection agreement process is in progress, although the specific study phase is not identified. The project's proposed commercial operation date is November 1, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IN

County

Sullivan

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Hallador Power

Utility

Hallador Power

Entity

MISO

Service Type

NRIS

Point of Interconnection

Merom Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
INDIANA.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
HE.MEROM2
POI Substation
Merom Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.