Query
Meitner 2 Wind
Type
Entity Briefing
Entity
Meitner 2 Wind
Technology
wind
Generated
2026-10-19T16:21:18.744Z

Briefing on Meitner 2 Wind

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
709 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2028-06-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Meitner 2 Wind is a 709 MW Wind project in Texas, currently active.

Intersect Power is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-30.

Queue ID
ERCOT-29INR0103
Location
Gray, Texas
Technology
Wind
Developer
Intersect Power
Market / region
ERCOT
Point of interconnection
79000 Gray Substation 345kV

What stands out

1

Meitner 2 Wind is a 709 MW Wind project in Texas with status active.

2

Intersect Power is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-06-30.

Market and operating context

Queue date
2025-06-05
Proposed COD
2028-06-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Meitner 2 Wind — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0103
LocationGray, Texas
TechnologyWind
DeveloperIntersect Power
Market / regionERCOT
Point of interconnection79000 Gray Substation 345kV
Queue date2025-06-05
Proposed COD2028-06-30