Briefing/projectactive
Medina City BESS is a 10 MW Battery project in ERCOT, currently active.
Regis Medina, LLC is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2026-03-02.
- Queue ID
- ERCOT-24INR0502
- Technology
- Battery
- Developer
- Regis Medina, LLC
- Market / region
- ERCOT
- Point of interconnection
- Station Name (TDSP Station Code): MEDINA; Load/Load Transformer Name: L_MEDICI9_1Y; PTI BUS number: 7430; Voltage in kV (Transmission Level): 69kV_x000D_ Transformers: 3x 4000kVA 800VAC Δ - 12.47kVA Υ_x000D_ 12,000 MVA connected, Running load limited to 9.99 MW
What stands out
1
Medina City BESS is a 10 MW Battery project with status active.
2
Regis Medina, LLC is the reported developer.
3
The reported queue phase is In Progress (unknown study); proposed COD is 2026-03-02.
Market and operating context
- Queue date
- 2022-11-29
- Proposed COD
- 2026-03-02
- IA status
- In Progress (unknown study)
- Study phase
- In Progress (unknown study)
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.