Briefing/projectactive
McCrae Energy Storage is a 306 MW Battery project in Texas, currently active.
McCrae Energy Storage, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-09-25.
- Queue ID
- ERCOT-25INR0661
- Location
- Erath, Texas
- Technology
- Battery
- Developer
- McCrae Energy Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV 1900 COMCHPKW_5 - 1440 COMCHESS1_5
What stands out
1
McCrae Energy Storage is a 306 MW Battery project in Texas with status active.
2
McCrae Energy Storage, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-09-25.
Market and operating context
- Queue date
- 2024-05-20
- Proposed COD
- 2028-09-25
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.