McCrae Energy Storage (ERCOT-25INR0661) — Project Summary

Queue ID
ERCOT-25INR0661
Capacity
306.35 MW
Technology
Battery
Status
active
Location
Erath, TX
Region
ERCOT
Developer
McCrae Energy Storage, LLC
IA Status
IA Executed

McCrae Energy Storage

ERCOT-25INR0661BetaActiveBatteryERCOTLBNL + Live

306.35 MW storage in Erath, TX · In queue since May 2024 · Proposed COD September 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

306.35 MW

Capacity

1

Components

Battery

2y 6m

In Queue

IA Executed

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1y 7m

IA → COD

2y 9m

Total Duration

1y 7m

Construction75%
Queue EntryMay 20, 2024

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 30, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Completed, IA

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-09-25

Queue history
25INR0661 · 29 monthly ERCOT reports, May 2024 – Sep 2026

Projected COD moved

2 times

Dec 2025 → Sep 2028

Net change

+33 months

first report to latest

Capacity

306 → 306 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMay 20, 2024
Facilities study approvedFeb 17, 2026
Interconnection agreement signedDec 30, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Sep 25, 2028
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
IA Executed
Active in the ERCOT queue with IA executed 2025-12-30. Oncor filed interconnection agreement documents with the Texas PUC on 2026-01-28, and ercotqueue.com reports IA and FIS complete. No construction or financing announcement found.
Financing
Not recorded

Milestones in this assessment

IA executedDec 30, 2025Latest in this assessment

Interconnection agreement executed per LBNL; ercotqueue.com reports IA and FIS complete.

ercotqueue.com
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. ercotqueue.com/project/25INR0661
  2. interchange.puc.texas.gov/search/filings/?UtilityType=E&ControlNumber=35077&DocumentType=ALL&SortBy=ItemNumber&SortOrder=Descending
  3. texas-biz.com/co/mccrae-energy-storage-llc
  4. cleanview.co/power-projects/planned/battery-storage-projects/texas/25INR0661/mccrae-energy-storage

Commercial operation date: Only the LBNL proposed COD of 2028-09-25 exists. Cleanview's 'Expected online 2028' and the infrasure.ai listing both appear to be derived from the same queue data, so they are not independent confirmation. No press release or developer announcement gives a different date.

Developer: Only the project LLC is identified. Bizapedia and texas-biz show it as a foreign LLC registered in Texas on 2026-01-12, but no parent or operating company is named. The Frontier Power USA/Bimerge Facebook snippet only mentions McCrae in passing, so it does not establish a link.

Status: LBNL shows IA Executed with an IA date of 2025-12-30. PUC Interchange filings from Oncor dated 2026-01-28 and the ercotqueue.com summary are consistent with that. Nothing indicates construction has started.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The McCrae Energy Storage project is a proposed 306.35 MW battery storage project located in Erath County, Texas. The project is being developed by McCrae Energy Storage, LLC. It is currently in the ERCOT interconnection queue as entry ERCOT-25INR0661, with a queue entry date of May 20, 2024.

The proposed commercial operation date for the McCrae Energy Storage project is September 25, 2028. Its interconnection status is currently in the Facility Study phase. The point of interconnection is Tap 345 kV 1900 COMCHPKW_5 - 1440 COMCHESS1_5.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

TX

County

Erath

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

McCrae Energy Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 1900 COMCHPKW_5 - 1440 COMCHESS1_5

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.