Marshall Spring Solar is a 150 MW Solar+Battery project in Texas, currently active.
Marshall Springs Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-07-01.
- Queue ID
- ERCOT-25INR0353
- Location
- Gillespie, Texas
- Technology
- Solar+Battery
- Developer
- Marshall Springs Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- New POI station between 7132 L_GILLES8_1Y - 7126 L_FERGUS8_1Y 138kV line and 7132 L_GILLES8_1Y - 7128 L_HORSBA8_1Y 138kV line, then loop in both lines into the new POI station.
What stands out
Marshall Spring Solar is a 150 MW Solar+Battery project in Texas with status active.
Marshall Springs Solar, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2026-07-01.
Latest linked story: “Marshall solar farm takes shape” (marshallindependent.com, 2024-06-11).
Market and operating context
- Queue date
- 2023-02-20
- Proposed COD
- 2026-07-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.