Query
Marshall Spring Solar
Type
Entity Briefing
Entity
Marshall Spring Solar
Technology
solar
Generated
2026-09-18T17:01:30.125Z

Briefing on Marshall Spring Solar

Entity Briefing
Generated Sep 18, 2026·Dataset freshness not reported
150 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2026-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Marshall Spring Solar is a 150 MW Solar+Battery project in Texas, currently active.

Marshall Springs Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-07-01.

Queue ID
ERCOT-25INR0353
Location
Gillespie, Texas
Technology
Solar+Battery
Developer
Marshall Springs Solar, LLC
Market / region
ERCOT
Point of interconnection
New POI station between 7132 L_GILLES8_1Y - 7126 L_FERGUS8_1Y 138kV line and 7132 L_GILLES8_1Y - 7128 L_HORSBA8_1Y 138kV line, then loop in both lines into the new POI station.

What stands out

1

Marshall Spring Solar is a 150 MW Solar+Battery project in Texas with status active.

2

Marshall Springs Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-07-01.

4

Latest linked story: “Marshall solar farm takes shape” (marshallindependent.com, 2024-06-11).

Market and operating context

Queue date
2023-02-20
Proposed COD
2026-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Marshall Spring Solar — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0353
LocationGillespie, Texas
TechnologySolar+Battery
DeveloperMarshall Springs Solar, LLC
Market / regionERCOT
Point of interconnectionNew POI station between 7132 L_GILLES8_1Y - 7126 L_FERGUS8_1Y 138kV line and 7132 L_GILLES8_1Y - 7128 L_HORSBA8_1Y 138kV line, then loop in both lines into the new POI station.
Queue date2023-02-20
Proposed COD2026-07-01