Briefing on Maleza Storage

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
151 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Maleza Storage is a 151 MW Solar+Battery project in Texas, currently active.

Brush Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-31.

Queue ID
ERCOT-21INR0456
Location
Wharton, Texas
Technology
Solar+Battery
Developer
Brush Storage, LLC
Market / region
ERCOT
Point of interconnection
tap Blue – Hillje 345 kv Ckt.#27

What stands out

1

Maleza Storage is a 151 MW Solar+Battery project in Texas with status active.

2

Brush Storage, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-31.

Market and operating context

Queue date
2019-10-31
Proposed COD
2028-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Maleza Storage — verified asset snapshot

FieldValue
Queue IDERCOT-21INR0456
LocationWharton, Texas
TechnologySolar+Battery
DeveloperBrush Storage, LLC
Market / regionERCOT
Point of interconnectiontap Blue – Hillje 345 kv Ckt.#27
Queue date2019-10-31
Proposed COD2028-12-31