Briefing on LUND STORAGE CENTER 1

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
408 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-12-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

LUND STORAGE CENTER 1 is a 408 MW Battery project in Texas, currently active.

Lund Storage Center 1, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-31.

Queue ID
ERCOT-26INR0045
Location
Bastrop, Texas
Technology
Battery
Developer
Lund Storage Center 1, LLC
Market / region
ERCOT
Point of interconnection
TAP 138 KV LINE AND CREATE NEW BUS BETWEEN KIMBRO (7337) AND ELGIN SWITCH (3650)

What stands out

1

LUND STORAGE CENTER 1 is a 408 MW Battery project in Texas with status active.

2

Lund Storage Center 1, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-31.

Market and operating context

Queue date
2023-01-17
Proposed COD
2028-12-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

LUND STORAGE CENTER 1 — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0045
LocationBastrop, Texas
TechnologyBattery
DeveloperLund Storage Center 1, LLC
Market / regionERCOT
Point of interconnectionTAP 138 KV LINE AND CREATE NEW BUS BETWEEN KIMBRO (7337) AND ELGIN SWITCH (3650)
Queue date2023-01-17