Query
Lucky Wind
Type
Entity Briefing
Entity
Lucky 7 Solar
State
KY
Generated
2026-10-12T10:49:28.891Z

Briefing on Lucky 7 Solar

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
102 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2027-09-20
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Lucky 7 Solar is a 102 MW Solar project in Texas, currently active.

Lucky 7 Solar Farm LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-09-20.

Queue ID
ERCOT-26INR0409
Location
Hopkins, Texas
Technology
Solar
Developer
Lucky 7 Solar Farm LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 2621 Sandy Ranch Switch - 2464 CASH SWITCH

What stands out

1

Lucky 7 Solar is a 102 MW Solar project in Texas with status active.

2

Lucky 7 Solar Farm LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-09-20.

4

Latest linked story: “OCI Energy and Sabanci Renewables Expand Partnership with” (GlobeNewswire, 2025-08-15).

Market and operating context

Queue date
2024-03-22
Proposed COD
2027-09-20
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Lucky 7 Solar — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0409
LocationHopkins, Texas
TechnologySolar
DeveloperLucky 7 Solar Farm LLC
Market / regionERCOT
Point of interconnectionTap 345kV 2621 Sandy Ranch Switch - 2464 CASH SWITCH
Queue date2024-03-22
Proposed COD2027-09-20