Briefing/projectactive
Lucky 7 Solar is a 102 MW Solar project in Texas, currently active.
Lucky 7 Solar Farm LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-09-20.
- Queue ID
- ERCOT-26INR0409
- Location
- Hopkins, Texas
- Technology
- Solar
- Developer
- Lucky 7 Solar Farm LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 2621 Sandy Ranch Switch - 2464 CASH SWITCH
What stands out
1
Lucky 7 Solar is a 102 MW Solar project in Texas with status active.
2
Lucky 7 Solar Farm LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-09-20.
4
Latest linked story: “OCI Energy and Sabanci Renewables Expand Partnership with” (GlobeNewswire, 2025-08-15).
Market and operating context
- Queue date
- 2024-03-22
- Proposed COD
- 2027-09-20
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.