Briefing/projectactive
Louisa Energy Storage is a 103 MW Battery project in Texas, currently active.
VESI 49 LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2029-03-12.
- Queue ID
- ERCOT-24INR0108
- Location
- Bexar, Texas
- Technology
- Battery
- Developer
- VESI 49 LLC
- Market / region
- ERCOT
- Point of interconnection
- 138 kV Helotes (#5200)
What stands out
1
Louisa Energy Storage is a 103 MW Battery project in Texas with status active.
2
VESI 49 LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2029-03-12.
Market and operating context
- Queue date
- 2021-11-16
- Proposed COD
- 2029-03-12
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.