Query
Longview Wind
Type
Entity Briefing
Entity
Longview Wind
Generated
2026-10-19T19:02:33.081Z

Briefing on Longview Wind

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
353 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2028-12-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Longview Wind is a 353 MW Wind project in Texas, currently active.

Longview Wind, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-12-01.

Queue ID
ERCOT-26INR0530
Location
Dawson, Texas
Technology
Wind
Developer
Longview Wind, LLC
Market / region
ERCOT
Point of interconnection
Venturi (Bus #59923)

What stands out

1

Longview Wind is a 353 MW Wind project in Texas with status active.

2

Longview Wind, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2028-12-01.

4

Latest linked story: “As wind-turbine blades get bigger, moving them becomes a challenge” (DredgeWire, 2023-11-07).

Market and operating context

Queue date
2025-09-22
Proposed COD
2028-12-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Longview Wind — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0530
LocationDawson, Texas
TechnologyWind
DeveloperLongview Wind, LLC
Market / regionERCOT
Point of interconnectionVenturi (Bus #59923)
Queue date2025-09-22
Proposed COD2028-12-01