Briefing/projectactive
Longfellow Solar I is a 178 MW Solar+Battery project in Texas, currently active.
CENTURY GAS PROCESSING, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2028-12-31.
- Queue ID
- ERCOT-24INR0452
- Location
- Pecos, Texas
- Technology
- Solar+Battery
- Developer
- CENTURY GAS PROCESSING, LLC
- Market / region
- ERCOT
- Point of interconnection
- 38431 TNCENTRY1_1 138 KV
What stands out
1
Longfellow Solar I is a 178 MW Solar+Battery project in Texas with status active.
2
CENTURY GAS PROCESSING, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2028-12-31.
Market and operating context
- Queue date
- 2022-11-07
- Proposed COD
- 2028-12-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.