Briefing/projectactive
Longday Solar SLF is a 201 MW Solar+Battery project in Texas, currently active.
Longday Solar is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-15.
- Queue ID
- ERCOT-25INR0501
- Location
- Kinney, Texas
- Technology
- Solar+Battery
- Developer
- Longday Solar
- Market / region
- ERCOT
- Point of interconnection
- Tap138 kV 8252 Brackettville - 8260 Escondido
What stands out
1
Longday Solar SLF is a 201 MW Solar+Battery project in Texas with status active.
2
Longday Solar is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-15.
Market and operating context
- Queue date
- 2023-07-31
- Proposed COD
- 2027-12-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.