203 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-05-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Loma Pinta Solar is a 203 MW Solar project in Texas, currently active.

Loma Pinta Wind Energy, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-05-31.

Queue ID
ERCOT-22INR0357
Location
La Salle, Texas
Technology
Solar
Developer
Loma Pinta Wind Energy, LLC
Market / region
ERCOT
Point of interconnection
5705 Fowlerton 138kV

What stands out

1

Loma Pinta Solar is a 203 MW Solar project in Texas with status active.

2

Loma Pinta Wind Energy, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-05-31.

Market and operating context

Queue date
2020-06-03
Proposed COD
2028-05-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Loma Pinta Solar — verified asset snapshot

FieldValue
Queue IDERCOT-22INR0357
LocationLa Salle, Texas
TechnologySolar
DeveloperLoma Pinta Wind Energy, LLC
Market / regionERCOT
Point of interconnection5705 Fowlerton 138kV
Queue date2020-06-03