Limitless Energy Hub I is a 1.2 GW Gas project in Texas, currently active.
Limitless Energy Hub I LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-01.
- Queue ID
- ERCOT-27INR0581
- Location
- Wilbarger, Texas
- Technology
- Gas
- Developer
- Limitless Energy Hub I LLC
- Market / region
- ERCOT
- Point of interconnection
- 6101 RILEY7A Substation 345kV
What stands out
Limitless Energy Hub I is a 1.2 GW Gas project in Texas with status active.
Limitless Energy Hub I LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-12-01.
Latest linked story: “Texas’ $7.2 billion loan program for gas power plants has approved two projects in two years” (Houston Public Media, 2025-08-26).
Market and operating context
- Queue date
- 2025-11-05
- Proposed COD
- 2028-12-01
- IA status
- Facility Study
- Study phase
- Facility Study