Briefing on Limitless Energy Hub I

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
1.2 GW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2028-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Limitless Energy Hub I is a 1.2 GW Gas project in Texas, currently active.

Limitless Energy Hub I LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-12-01.

Queue ID
ERCOT-27INR0581
Location
Wilbarger, Texas
Technology
Gas
Developer
Limitless Energy Hub I LLC
Market / region
ERCOT
Point of interconnection
6101 RILEY7A Substation 345kV

What stands out

1

Limitless Energy Hub I is a 1.2 GW Gas project in Texas with status active.

2

Limitless Energy Hub I LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-12-01.

4

Latest linked story: “Texas’ $7.2 billion loan program for gas power plants has approved two projects in two years” (Houston Public Media, 2025-08-26).

Market and operating context

Queue date
2025-11-05
Proposed COD
2028-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Limitless Energy Hub I — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0581
LocationWilbarger, Texas
TechnologyGas
DeveloperLimitless Energy Hub I LLC
Market / regionERCOT
Point of interconnection6101 RILEY7A Substation 345kV
Queue date2025-11-05
Proposed COD2028-12-01