Query
Liatris Flexible Gas
Type
Entity Briefing
Entity
Liatris Flexible Gas
Technology
gas
Generated
2026-10-19T10:02:07.078Z

Briefing on Liatris Flexible Gas

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
205 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2029-02-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Liatris Flexible Gas is a 205 MW Gas project in Texas, currently active.

Stone Creek Peaker LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2029-02-01.

Queue ID
ERCOT-26INR0408
Location
Brazoria, Texas
Technology
Gas
Developer
Stone Creek Peaker LLC
Market / region
ERCOT
Point of interconnection
Tap 138 kV (42980) Nash - (44010) WA Parish CKT02

What stands out

1

Liatris Flexible Gas is a 205 MW Gas project in Texas with status active.

2

Stone Creek Peaker LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2029-02-01.

Market and operating context

Queue date
2024-03-22
Proposed COD
2029-02-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Liatris Flexible Gas — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0408
LocationBrazoria, Texas
TechnologyGas
DeveloperStone Creek Peaker LLC
Market / regionERCOT
Point of interconnectionTap 138 kV (42980) Nash - (44010) WA Parish CKT02
Queue date2024-03-22
Proposed COD2029-02-01