Briefing on Infrakey Waco Data Park Gas 2

Entity Briefing
Generated Oct 7, 2026·Dataset freshness not reported
active
Current status
Gas
Technology
ERCOT
Market / region
2027-06-01
Proposed COD
Briefing/projectactive

Infrakey Waco Data Park Gas 2 is a 0 MW Gas project in Texas, currently active.

Infrakey Capital LLC is the reported developer. Proposed COD is 2027-06-01.

Queue ID
ERCOT-27INR0498
Location
McLennan, Texas
Technology
Gas
Developer
Infrakey Capital LLC
Market / region
ERCOT
Point of interconnection
252 BOSQUESW8 138kV (Brazos Connection)

What stands out

1

Infrakey Waco Data Park Gas 2 is a 0 MW Gas project in Texas with status active.

2

Infrakey Capital LLC is the reported developer.

3

proposed COD is 2027-06-01.

Market and operating context

Queue date
2025-04-21
Proposed COD
2027-06-01

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Infrakey Waco Data Park Gas 2 — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0498
LocationMcLennan, Texas
TechnologyGas
DeveloperInfrakey Capital LLC
Market / regionERCOT
Point of interconnection252 BOSQUESW8 138kV (Brazos Connection)
Queue date2025-04-21
Proposed COD2027-06-01