Infrakey Waco Data Park Gas 2
— generation in McLennan, TX · In queue since April 2025 · Proposed COD June 2030
—
Capacity
0
Components
1y 7m
In Queue
—
IA Status
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-06-01
Projected COD moved
1 time
Jun 2027 → Jun 2030
Net change
+36 months
first report to latest
Capacity
0 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Infrakey Waco Data Park Gas 2 project is a proposed gas-fired generation project with a total capacity not specified in public data. It is located in McLennan County, Texas, and is being developed by Infrakey Capital LLC. The project is interconnected within the Electric Reliability Council of Texas (ERCOT) region, queue ID ERCOT-27INR0498, with a queue entry date of April 21, 2025.
The proposed commercial operation date (COD) for the Infrakey Waco Data Park Gas 2 project is June 1, 2027. The point of interconnection (POI) is at the 252 BOSQUESW8 138kV Brazos Connection. The project utilizes gas combustion turbine technology. The interconnection agreement (IA) status is not specified in public data.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
McLennan
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Infrakey Capital LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
252 BOSQUESW8 138kV (Brazos Connection)
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Obtain CapEx data for the identified 'Cotton Solar' plant.
Data-driven briefing on Infrakey Waco Data Park Gas 2 — fleet, generation, financial, and news signals.
Fagus Solar Park 1 SLF in Arkansas queue pipeline — 1 projects by technology and status
Data-driven briefing on Infrakey Waco Data Park Gas 2 — fleet, generation, financial, and news signals.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Retrieve recent generation data for 'Luverne Wind Energy Center' (plant_id: 57031) and 'Luverne' (plant_id: 1990).
Data-driven briefing on Infrakey Waco Data Park Gas 2 — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.