Briefing/projectactive
Leighton Solar SLF is a 183 MW Solar project in Texas, currently active.
Lavender Solar LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-09-01.
- Queue ID
- ERCOT-24INR0298
- Location
- Limestone, Texas
- Technology
- Solar
- Developer
- Lavender Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- 99 BENHUR 69kV
What stands out
1
Leighton Solar SLF is a 183 MW Solar project in Texas with status active.
2
Lavender Solar LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-09-01.
Market and operating context
- Queue date
- 2022-05-11
- Proposed COD
- 2027-09-01
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.