Briefing/projectactive
KEY STORAGE 1 is a 309 MW Battery project in California, currently active.
The reported queue phase is C11. Proposed COD is 2026-10-01.
- Queue ID
- CAISO-1479
- Location
- Fresno, California
- Technology
- Battery
- Market / region
- CAISO
- Point of interconnection
- Gates 500 kV
What stands out
1
KEY STORAGE 1 is a 309 MW Battery project in California with status active.
2
The reported queue phase is C11; proposed COD is 2026-10-01.
3
Latest linked story: “Utility-Scale Energy Storage Procurements in 2026: Contracting and Risk Allocation” (Morgan Lewis, 2026-03-13).
Market and operating context
- Queue date
- 2018-04-16
- Proposed COD
- 2026-10-01
- IA status
- IA Executed
- Study phase
- C11
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.