Briefing/projectactive
Jaguar Solar is a 301 MW Solar+Battery project in Texas, currently active.
PP Jaguar Solar LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-12-11.
- Queue ID
- ERCOT-24INR0038
- Location
- Mclennan, Texas
- Technology
- Solar+Battery
- Developer
- PP Jaguar Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 13405 Tradinghouse SES - 68090 Sam Switch
What stands out
1
Jaguar Solar is a 301 MW Solar+Battery project in Texas with status active.
2
PP Jaguar Solar LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-12-11.
4
Latest linked story: “Toyota to buy clean power from a $1.1 billion solar farm in Texas” (Electrek, 2024-11-01).
Market and operating context
- Queue date
- 2021-03-18
- Proposed COD
- 2027-12-11
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.