Query
Infinium Solar
Type
Entity Briefing
Entity
Infinium Solar
Generated
2026-10-19T20:02:26.856Z

Briefing on Infinium Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
402 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-07-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Infinium Solar is a 402 MW Solar project in Texas, currently active.

Jackalope Flats Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-07-01.

Queue ID
ERCOT-29INR0019
Location
Howard, Texas
Technology
Solar
Developer
Jackalope Flats Solar, LLC
Market / region
ERCOT
Point of interconnection
#1058 Longshore_5 345kV

What stands out

1

Infinium Solar is a 402 MW Solar project in Texas with status active.

2

Jackalope Flats Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-07-01.

Market and operating context

Queue date
2024-08-16
Proposed COD
2029-07-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Infinium Solar — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0019
LocationHoward, Texas
TechnologySolar
DeveloperJackalope Flats Solar, LLC
Market / regionERCOT
Point of interconnection#1058 Longshore_5 345kV
Queue date2024-08-16
Proposed COD2029-07-01