Briefing on Indigo Solar 3

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
800 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-11-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Indigo Solar 3 is a 800 MW Solar project in Texas, currently active.

Indigo solar 3 is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-11-01.

Queue ID
ERCOT-28INR0067
Location
Fisher, Texas
Technology
Solar
Developer
Indigo solar 3
Market / region
ERCOT
Point of interconnection
Tap Line Segment Tankawa (Bus #1048) to Graham (Bus #1430)

What stands out

1

Indigo Solar 3 is a 800 MW Solar project in Texas with status active.

2

Indigo solar 3 is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-11-01.

Market and operating context

Queue date
2024-10-29
Proposed COD
2028-11-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Indigo Solar 3 — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0067
LocationFisher, Texas
TechnologySolar
DeveloperIndigo solar 3
Market / regionERCOT
Point of interconnectionTap Line Segment Tankawa (Bus #1048) to Graham (Bus #1430)
Queue date2024-10-29
Proposed COD2028-11-01