Indigo Solar is a 150 MW Solar+Battery project in Texas, currently active.
Innovative Solar 245, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-09-17.
- Queue ID
- ERCOT-21INR0031
- Location
- Fisher, Texas
- Technology
- Solar+Battery
- Developer
- Innovative Solar 245, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345 kV 68001 Claytonville – 68004 Phantom Hill Circuit 2
What stands out
Indigo Solar is a 150 MW Solar+Battery project in Texas with status active.
Innovative Solar 245, LLC is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2027-09-17.
Latest linked story: “Acquisition sought for four Texas solar projects with 690 MW combined capacity” (pv magazine USA, 2022-01-04).
Market and operating context
- Queue date
- 2018-09-27
- Proposed COD
- 2027-09-17
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.