Briefing on IEP Blackhawk

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

IEP Blackhawk is a 100 MW Battery project in Texas, currently active.

IEP Texas Verde II, llc is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-01.

Queue ID
ERCOT-25INR0310
Location
Galveston, Texas
Technology
Battery
Developer
IEP Texas Verde II, llc
Market / region
ERCOT
Point of interconnection
38740 Heights Substation 138kV

What stands out

1

IEP Blackhawk is a 100 MW Battery project in Texas with status active.

2

IEP Texas Verde II, llc is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-12-01.

Market and operating context

Queue date
2023-04-07
Proposed COD
2026-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

IEP Blackhawk — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0310
LocationGalveston, Texas
TechnologyBattery
DeveloperIEP Texas Verde II, llc
Market / regionERCOT
Point of interconnection38740 Heights Substation 138kV
Queue date2023-04-07
Proposed COD2026-12-01