Briefing/projectactive
HyFuels Green Lake Solar is a 347 MW Solar project in Texas, currently active.
HyFuels Green Lake Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.
- Queue ID
- ERCOT-26INR0019
- Location
- Victoria, Texas
- Technology
- Solar
- Developer
- HyFuels Green Lake Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- Dokmai 138kV Substation (bus #80090)
What stands out
1
HyFuels Green Lake Solar is a 347 MW Solar project in Texas with status active.
2
HyFuels Green Lake Solar LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-01.
Market and operating context
- Queue date
- 2022-09-27
- Proposed COD
- 2027-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.